Projects Procedure

A clear project procedure guides every stage from RFQ, quotation and design confirmation through mould manufacturing, trial, sample approval, packing and final delivery on schedule.

Projects Procedure

No. Process Stage Details
01Customer RFQRequest for quotation with product drawings, samples or just a concept.
02QuotationQuotation is issued within 1–2 days.
03Order ConfirmationThe project starts upon receipt of the deposit.
04Assembly Drawing2–5 days for 2D drawing design.
05Detailed DesignDetailed 3D drawings are prepared for mold components.
06Drawings Final ConfirmationThe drawings are finally confirmed by the customer.
07ScheduleThe project schedule is followed up throughout production.
08Mould ManufactureMould manufacturing proceeds according to schedule. Weekly reports help the customer monitor production progress.
09Mould Trial Running and Sample SubmissionMould trial running is completed on schedule, and samples are submitted together with the inspection report.
10Sample ConfirmationAfter inspecting the final samples according to the specifications, the customer provides confirmation.
11PackingThe tooling is completed and packed.
12DeliveryMaterial certification, a CD containing 2D and 3D assembly drawings, and the mould trial-running video are shipped together with the mould.